Vascular access · Clinical evaluation · EU MDR

Implantable venous access ports under the EU MDR: what a Notified Body asked, and what the 2026 WET list changes

Many Notified Body findings on a port CER have nothing to do with whether the device works. They are about consistency: between the CER, the IFU and the risk file, between the claims and the literature, and between a benchmark and what the data can support. Here is what a reviewer actually asked on a port file, and what changes now that port catheters are on the WET list.

Eclevar MedTech clinical evaluation team · Updated November 26, 2026 · 7 minute read

Request a port CER gap review Go to the reviewer's findings

01

The short answer

A totally implantable venous access port whose catheter ends in the superior vena cava is an implant in contact with the central circulatory system, so it is class III under the MDR. Since June 2026, port catheters are on the list in Article 61(6)(b), which means a clinical investigation is not mandatory when the clinical evaluation rests on sufficient clinical data.

For most port manufacturers, the clinical data exist: decades of published series and their own post-market data. What decides the review is whether the file is consistent and honest about what those data show. The findings below are typical.

02

Class III, and what the WET listing changes

Rule 8 of Annex VIII places implantable devices in direct contact with the heart or the central circulatory system in class III, and the MDR's definition of that system includes the superior vena cava. Delegated Regulation (EU) 2026/1451 added port catheters and port plugs to Article 61(6)(b). Confirm with your Notified Body that the entry covers your full port system as described in the IFU.

  • What changes. A new clinical investigation is no longer the default if existing data are sufficient for every claim.
  • What stays. The CER, the PMCF plan, the summary of safety and clinical performance and the implant card, since ports are not among the implants exempted from it.
  • What to check. How Article 54 on the clinical evaluation consultation procedure applies to your certification. The WET listing speaks to the clinical investigation only.

Our guide to the 2026 WET list covers the other device types added.

03

What the reviewer asked on a port CER

The findings below come from a Notified Body's clinical evaluation assessment of an implantable port range during a certificate renewal, on a CER our team wrote and updated. The reviewer concluded that most points were a lack of formalization, not a lack of compliance, and each still had to be closed before the review could end.

Notified Body findings on an implantable port CER, and how to avoid them
FindingWhy it mattersHow to avoid it
A contraindication listed in the CER, for variants not rated for power injection, was missing from the IFU contraindicationsThe IFU is what the user reads. A risk handled in the CER but not in the IFU is not controlledOne table of contraindications, warnings and side effects, checked line by line across CER, IFU and risk file
No justification for leaving a clinical condition, severe coagulation disorders, out of the contraindicationsEvery omission against the state of the art has to be arguedRecord the reasoning for each condition the literature raises, included or not
State of the art publications not identified among the search resultsThe reviewer cannot trace the benchmarks back to the searchName every selected publication and link it to the search that found it
Complications found in the literature, such as pneumothorax and hematoma, missing from the risk fileThe literature review is meant to feed risk managementCross-check each complication reported in the device's own studies against the IFU and the risk file
A benchmark device with lower complication rates explained away by the smaller number of studies on itThe reviewer judged the data insufficient to support that statementReport the comparison as it is, and discuss differences in populations and definitions instead of dismissing it
Declarations of interest of the CER author and reviewers not dated and signedEvaluator independence and qualification are part of the evaluationSigned and dated declarations and CVs for every author and reviewer, at each revision

The reviewer also asked for the materials of every kit accessory, and looked at how a cluster of catheter disconnections at a single hospital, traced to handling, had been addressed through training and trend monitoring. Both are routine, and both cost a review cycle when they are missing. Under the MDR, these points sit in the same place: Annex XIV and the consistency the reviewer checks with the IFU requirements.

04

Endpoints and benchmarks

  • Performance. Technical success of implantation, time in use, and removal at the end of therapy rather than for a complication.
  • Early complications. Pneumothorax, arterial puncture, malposition, pocket hematoma and arrhythmia.
  • Late complications. Catheter-related infection, thrombosis, occlusion, catheter fracture or pinch-off, migration, extravasation and skin erosion over the port.
  • Claims with their own evidence. Power injection of contrast media, pediatric use and MRI compatibility, each supported by bench data and clinical data where the claim needs it.

Benchmarks should come from comparable populations, mostly patients receiving chemotherapy, with complications defined the same way. Rates vary widely between series because definitions and follow-up differ, so the CER should explain where its device sits and why, rather than quote the most favorable series.

05

A proportionate PMCF

In the file above, the reviewer accepted a PMCF plan with no new study, because no clinical data gap was identified, and with annual monitoring of two indicators: removal for technical malfunction, and late complications in adults and children. For a port on the WET list, that structure is still a sound basis, with the justification written in the terms of MDCG 2020-7: which residual risk each activity follows, and what result would trigger a study.

See how we design PMCF under the MDR, and our clinical evaluation report service. For a device that relies on Article 61(10), see how to define an indirect clinical benefit.

Close the findings before the reviewer writes them

Send us the CER, the IFU, the risk management report and the PMCF plan. Our clinical evaluation team, which includes former Notified Body reviewers, runs the same consistency checks a reviewer runs and tells you what to fix before submission.

Request a port CER gap review

06

Questions manufacturers ask

What class is an implantable venous access port under the EU MDR?

Class III when its catheter is in direct contact with the central circulatory system, such as the superior vena cava. Rule 8 of Annex VIII places such implants in class III.

Are implantable port catheters on the MDR WET list?

Yes. Delegated Regulation (EU) 2026/1451 added port catheters and port plugs to Article 61(6)(b). Confirm with your Notified Body that the entry covers your system as described in the IFU.

Does a port still need a clinical investigation for MDR certification?

Not if its clinical evaluation rests on sufficient clinical data for every claim. Claims such as power injection or pediatric use may need their own data.

What do Notified Bodies most often find in a port CER?

Inconsistencies between the CER, the IFU and the risk file, state of the art publications that cannot be traced to the search, unfavorable benchmark comparisons that are explained away, and missing signed declarations of interest.

Is a PMCF study required for an implantable port?

Not always. If no clinical data gap is identified, a PMCF plan built on literature monitoring, complaint trending and defined indicators can be accepted, provided the plan justifies it.

Sources and scope

This article is general information for clinical and regulatory teams. It does not predict a conformity assessment outcome. The Notified Body findings are reported anonymously, without the device, the manufacturer or the Notified Body.

Reforming Clinical Evaluation of Medical Devices in Europe